Concrete Pier Block Deck: Why Most DIYers Get This Wrong

Concrete Pier Block Deck: Why Most DIYers Get This Wrong

You’re standing in the backyard, staring at a patch of dirt, dreaming of a grill and a lounge chair. You want a deck. But the thought of digging three-foot-deep holes and pouring wet concrete makes your back ache before you even start. So, you look at those heavy, gray pyramids at the hardware store. The concrete pier block deck seems like the ultimate shortcut. Just plop them down, throw some 4x4s in the top, and call it a day, right? Well, sort of. Honestly, it's a bit more complicated than the Pinterest photos make it look. If you don't respect the soil or the local building inspector, your "easy" weekend project might literally crawl away from your house over the next five years.

Building a deck this way is basically creating a "floating" structure. It isn't anchored into the earth like a traditional post-and-footing setup. This is great for small, low-profile platforms, but it's a disaster waiting to happen if you're trying to build a second-story balcony.

The Reality of Using a Concrete Pier Block Deck

Let's talk about frost heave. It's a term that strikes fear into the hearts of northern builders. When the ground freezes, the moisture in the soil turns to ice and expands. If your pier blocks are just sitting on top of the grass, that ice is going to push them up. Then, when it thaws, they sink. But they never sink back to the exact same spot. Over a few seasons, your deck starts to look like a funhouse floor. This is why many municipalities in the "Frost Belt" actually ban this method for any structure attached to a house.

📖 Related: When Did the First Daylight Savings Time Start? The Weird Truth About How We Began Messing With the Sun

If you're in a place like Florida or Arizona, you're mostly worried about wind. A concrete pier block deck is heavy, sure, but a strong hurricane or a massive gust can actually lift a light deck right off its blocks if it isn't properly strapped down. It's all about weight versus lift. You’ve got to be smart about how you’re weighting the frame.

Why the "Floating" Label Matters

Most people call these "floating decks." That’s because they aren't bolted to your home’s ledger board. If you bolt a deck to your house but put the other end on pier blocks, you’re asking for a structural nightmare. The house stays still; the blocks move. The resulting tension can rip the ledger right off your siding. If you're using blocks, the whole thing needs to be independent. It needs to be its own island.

Getting the Groundwork Right (Because You Can't Just Drop Them on Grass)

I see it all the time: people just setting the blocks on top of the turf. Don't do that. Within six months, the grass dies, the organic matter rots, and the block tilts.

  1. First, you've got to clear the area. Dig out about 4 to 6 inches of topsoil.
  2. Fill that space with crushed stone or compactable gravel.
  3. Use a plate compactor. You want that base to be as hard as a highway.
  4. Set your blocks on top of the compacted gravel.

This creates a drainage plane. Water is the enemy of any concrete pier block deck. If water pools around the base of the concrete, it softens the soil, and the block starts its slow journey into the earth. Brands like Dek-Block or the standard 12x12 pyramid blocks you find at Home Depot are designed to distribute the load, but they can only do so much if the "table" they’re sitting on is mushy.

Leveling is a Total Pain

Getting eight or twelve blocks perfectly level with each other is arguably harder than just digging a hole. You'll be moving gravel around, checking your string lines, and swearing at your 4-foot level for hours. A laser level is your best friend here. If you're off by even a half-inch on one corner, the "bounce" in the finished deck will drive you crazy every time someone walks across it.

The Lumber Choice: Ground Contact is Non-Negotiable

Since a concrete pier block deck usually sits very close to the ground, airflow is terrible. This is a recipe for rot. You can't just use standard "pressure treated" wood; you specifically need lumber rated for "Ground Contact." Look for the little plastic tag on the end of the board. It should say UC4A or higher.

  • Standard PT: Rated for UC3B (above ground). It will rot in three years if it's hovering over damp soil.
  • Ground Contact: Heavier chemical load, designed to survive the damp microclimate under a low-slung deck.

Also, think about your joist spacing. Most people go with 16 inches on center. But if you're using composite decking like Trex or Azek, those boards are "floppier" than wood. If you're building a low-profile deck on blocks, consider 12-inch spacing to keep everything feeling rock solid.

When Should You Definitely NOT Use Pier Blocks?

There are some hard lines you shouldn't cross. I wouldn't use this method for a hot tub. A standard 4-person hot tub weighs about 3,000 to 4,000 pounds when full of water and people. That kind of "point load" will drive a pier block straight into the soil like a tent stake. For heavy loads, you need deep, poured concrete footings that reach down to undisturbed subsoil or below the frost line.

Similarly, if your yard has a slope of more than a few inches over ten feet, pier blocks become dangerous. You'll end up with 4x4 posts that are too tall. Taller posts on top of unanchored blocks create a "hinge" point. One good shove and the whole deck can fold over like a card table. If your deck is more than 30 inches off the ground, most building codes are going to require permanent, buried footings anyway.

The Permit Question

Basically, every DIYer wants to skip the permit. I get it. But "floating" doesn't always mean "exempt." In many jurisdictions, if the deck is over 200 square feet, or if it's attached to the house, or if it’s more than 30 inches high, you need a permit. The beauty of the concrete pier block deck is that in many cities, if it's under that height and square footage, it's considered a "temporary structure"—sort of like a shed or a heavy piece of furniture. Always call the local building department and ask about "unattached floating platforms." It saves a lot of headaches when you try to sell your house later and the inspector flags an illegal deck.

✨ Don't miss: Why The Local Bar Atlanta Menu Actually Lives Up to the Hype

Practical Steps to a Solid Build

If you’re ready to pull the trigger, follow this sequence to avoid the common pitfalls.

Layout and Excavation
Don't just eyeball it. Use batter boards and string lines. This is the old-school way to ensure your deck is actually square. If the diagonals of your rectangle aren't equal, your decking boards will look crooked at the ends. Once the strings are up, dig out the "footprint" plus 6 inches on all sides.

The Base Layer
Lay down a heavy-duty landscape fabric. This isn't just for weeds; it keeps your gravel from sinking into the mud over time. Pour 4 inches of 3/4-minus gravel. Compact it until you can't see your footprint when you walk on it.

Block Placement
Set your first block at the highest point of the ground. Use that as your "benchmark." As you place the other blocks, use a straight 2x4 and a level to bring them up to the same height. You might need to add or remove small amounts of gravel under the blocks to get them perfect.

[Image showing the layout of a floating deck with multiple pier blocks]

Framing for Airflow
Since you're close to the dirt, use joist tape (like Butyl tape) on the tops of your joists. This prevents water from sitting in the screw holes and rotting the wood from the inside out. It's an extra $50 that adds ten years to the deck's life.

Hardware and Connections
Even though it's a "floating" deck, you should still use galvanized connectors. Use post caps to secure the 4x4 to the block, and joist hangers to connect your rim joists. Don't rely on "toenailing" screws. They will pull out as the wood swells and shrinks with the seasons.

Final Insights for the DIYer

The concrete pier block deck is a fantastic solution for a small patio replacement, a grill station, or a detached "island" deck in a sunny corner of the yard. It's accessible, relatively cheap, and can be finished in a weekend if you've got a helper. Just remember that you are at the mercy of the soil. Spend 70% of your time on the ground prep and 30% on the wood. Most people do the opposite, and that's why their decks start sagging by year three.

Verify your local frost depth. Even if you're using blocks, knowing how much the ground moves in your area will help you decide if you need a deeper gravel base. If you live in an area with expansive clay soil, be extra diligent with drainage; you don't want water sitting anywhere near those blocks.

📖 Related: Turkey Brine Emeril Lagasse: What Most People Get Wrong

Take your time with the initial leveling. It is the most frustrating part of the job, but once those blocks are set and squared, the rest of the project is just like playing with giant Legos.


Next Steps for Your Project:

  • Measure your proposed deck area and calculate the total weight (including people) to ensure you have enough pier blocks to distribute the load—usually one every 4 to 6 feet.
  • Check your local municipal code for the "30-inch rule" to see if you can skip the railing and the permanent footing requirements.
  • Order "Ground Contact" rated lumber specifically, as standard pressure-treated wood will fail prematurely in a low-clearance pier block application.