Steps to Renovating a House: What Most People Get Wrong

Steps to Renovating a House: What Most People Get Wrong

You’ve probably seen the shows where a sledgehammer goes through a wall and suddenly a gorgeous open-concept kitchen appears forty-two minutes later. It’s a lie. Honestly, the reality of the steps to renovating a house is less about the "big reveal" and more about managing a slow-motion explosion of your bank account and your patience. If you’re standing in a kitchen that looks like 1982 threw up on the linoleum, you’re likely itching to rip things out. Don't. Not yet.

Most people start by picking out tile. That’s a mistake. You don’t need a backsplash yet; you need a plan that won't make your contractor laugh behind your back. Renovation is a sequence, a very specific one, and if you trip on step two, you’ll be paying for it by step ten.

The Boring Part That Actually Saves You Money

Planning is miserable. It involves spreadsheets and measuring things three times because your house probably isn't actually level. Houses settle. They sag. They develop "character" that makes straight lines impossible. Before you touch a hammer, you need a feasibility study. This sounds fancy, but it basically just means checking if your dream of a walk-in shower will actually fit where the toilet currently sits without violating every plumbing code in the book.

Architects and designers aren't just for rich people. Hiring a pro for a few hours of consultation can prevent you from knocking down a load-bearing wall and having your second floor become your first floor. Real experts, like those at the American Institute of Architects (AIA), often point out that "scope creep" is what kills budgets. You start with a bathroom and suddenly you’re replacing the hallway carpet. Stop it. Define your "must-haves" versus your "if I win the lottery" items early.

Budgeting is where the tears usually happen. Take whatever number you think it will cost and add 20%. If your house was built before 1978, add 30%. Why? Because lead paint and asbestos are real, and they are expensive to deal with. According to the Environmental Protection Agency (EPA), disturbing these materials without proper mitigation is not just a health risk; it’s a legal nightmare. You'll need specialized contractors for that.

Permits: The Great Momentum Killer

You’re going to want to skip this. You’ll think, "It’s just a small deck," or "Nobody will know I moved this sink." Don't be that person. Unpermitted work is a ticking time bomb for when you try to sell the house. Title companies and savvy buyers will look at the public records, see that your 3-bedroom house is listed as a 2-bedroom, and walk away. Or worse, the city inspector sees a dumpster in your driveway, stops by, and shuts you down.

Navigating the steps to renovating a house requires a stop at the local building department. Every municipality is different. Some are chill; some act like you’re trying to build a nuclear silo in your backyard. Get your drawings in order. Pay the fees. It sucks, but having that signed permit taped to your window is your shield.

Demolition and the Ugly Truth

Demo day is the only part of the process that actually looks like the TV shows. It's loud. It’s dusty. It’s weirdly cathartic. But here is the thing: you can't just swing blindly. You need to know where your shut-off valves are. If you hit a live wire or a pressurized water line, your "fun" Saturday becomes a $5,000 emergency plumbing call.

  • Safety Gear: Real respirators, not just those flimsy paper masks.
  • Dumpster Logistics: Rent a bigger one than you think. Old plaster is incredibly heavy and takes up way more space than you’d expect.
  • Salvage: If you have original wood trim or vintage hardware, save it. Even if you don't want it, someone on Facebook Marketplace will pay for it.

Once the walls are open, the "Skeleton" of the house is revealed. This is the scariest part of the steps to renovating a house. This is when you find the termite damage from 1994 or the "creative" wiring a previous owner did with extension cords. It’s better to find it now than after you’ve put up the drywall.

💡 You might also like: 9am MST to PST: Why This One Hour Gap Messes Up So Many Meetings

Rough-In: The Invisible Work

Nobody takes photos of the rough-in stage for Instagram. It’s just a bunch of wires, pipes, and ductwork snaking through studs. But this is the most important part of the entire project. If the plumbing isn't sloped correctly, your drains will clog. If the electrical isn't zoned right, you’ll blow a circuit every time you use the microwave and the toaster at the same time.

This is the phase where you want the best pros you can afford. A "handyman" is great for fixing a door, but for a full rewire? Get a licensed electrician. They know the National Electrical Code (NEC). They know that you need AFCI breakers and GFCI outlets in wet areas.

During this time, you also handle the "envelope." If the roof is leaking or the windows are drafty, fix them now. There is zero point in putting up expensive wallpaper if water is going to seep in and ruin it in six months. Insulation goes in last. Don't skimp here. Modern spray foam or high-density mineral wool will save you a fortune on heating bills.

The Pivot Toward Pretty

Drywall is the turning point. Suddenly, it stops looking like a construction site and starts looking like a home again. It’s also the messiest phase because of the sanding. Dust will get into your eyelashes. It will get into your cereal. It will get into rooms you haven't even opened.

Pro tip: hanging drywall is easy; finishing it is an art form. If you want smooth walls, hire a pro for the taping and mudding. A bad drywall job is visible forever, especially when the sun hits it at an angle.

Once the walls are closed, the order of operations gets a bit debated. Usually, it's:

📖 Related: Haruharu Wonder Black Rice Moisture Deep Cleansing Oil: Why It Actually Works (and What It Won't Do)

  1. Flooring: Get the heavy stuff down.
  2. Cabinets: Set the anchors for your kitchen or bathroom.
  3. Painting: Some people paint before the floors, but if you’re doing hardwood that needs sanding, the dust will ruin your fresh paint.
  4. Trim and Molding: This hides the gaps between the walls and the floors. It’s the "mascara" of the house.

Why Your Kitchen Is Taking So Long

Kitchens are the most complex steps to renovating a house. You’re juggling countertops, appliances, backsplash, and lighting. If your countertop fabricator is backed up, the whole project stalls. You can’t install the sink without the counter. You can’t do the final plumbing without the sink.

Manage your lead times. In 2026, supply chains are better than they were a few years ago, but custom cabinets still take months. If you order them when you start demo, you’re already too late. Order them when you finish your plans.

The "Punch List" and Why It Never Ends

The last 5% of a renovation takes 50% of the energy. The "punch list" is the collection of small things: a missing switch plate, a cabinet door that squeaks, a bit of paint on the baseboard.

Contractors hate the punch list. They want to move on to the next big job. You have to be firm. Don't make the final payment until the list is clear. Once you pay that last check, getting them to come back to fix a crooked drawer is nearly impossible.

Actionable Next Steps for Your Project

So, you're ready to start. Don't grab the crowbar yet. Do these things in this order:

📖 Related: Is the Igloo 60 Quart Latitude Roller Cooler Actually Worth Your Money?

  1. Audit your finances: Figure out your absolute ceiling, then subtract 20% for the "oops" fund. That's your actual budget.
  2. Interview three contractors: Don't just go with the lowest bid. Ask for references and actually call them. Ask the references, "Did they finish on time?" and "How did they handle it when something went wrong?"
  3. Check your property survey: Ensure that any additions or exterior changes don't violate setbacks or easements.
  4. Create a "Clean Room": If you are living in the house during the renovation, designate one room that is a construction-free zone. You will need a place to retreat when the rest of the house feels like a disaster zone.
  5. Order "Long-Lead" items now: Windows, custom doors, and cabinets should be ordered before you even pull the first permit.

Renovating is a marathon, not a sprint. It’s going to be loud, it’s going to be expensive, and at some point, you’ll probably regret starting. But when you’re sitting in a space that actually works for your life, with wires that don't spark and a floor that doesn't creak, it’s worth it. Just take it one step at a time.